Upgrading of Electrical System (Overhead System) at Pastor Salazar National High School, TABANGO (ABC = 2,843,307.71)
Proposed Repair of Deped Leyte Division Office at Leyte Division, Palo (ABC = 999,837.11)
Proposed Repair/Rehabilitation of Classrooms at San Fransisco East PS, Alangalang (ABC = Php 1,415,486.72)
LOT 1 – Proposed Construction of 1 Storey Library Hub Building (22.50m x 9.50m) at Dr. Geronimo B. Zaldivar MSOF, Albuera (ABC = Php 6,142,488.85)
LOT 2 – Proposed Construction of 1 Storey Library Hub Building (22.50m x 9.50m) at Isabel NHS, Isabel (ABC = Php 6,297,143.88)




